Injection moulding machines
A range of machine sizes to match different components and production requirements.
Trap SystemsCROPG1 · MANUFACTURING & INFRASTRUCTURE
From a precisely moulded component to an assembled insect trap. Machinery, tooling experience and a flexible workforce, brought together around your product.

THE CAPABILITY BEHIND THE PRODUCT
Manufacturing strengths that support routine trap supply and the development of new configurations.
A range of machine sizes to match different components and production requirements.
Tooling is undertaken with professionals whose experience spans more than 25 years.
An assembly workforce deployed according to the scale and requirements of the project.
ROUTINE PRODUCTS · VOLUME SUPPLY
For most routine trap products, CropG1 can supply 100,000 pieces in 3–4 working days.
Applies to eligible routine models with existing tooling, available materials and an agreed assembly schedule. Confirm your model and quantity for a production date; freight time is additional. New designs and moulds have separate lead times.
Check your quantity and schedule ↗SPACE WITH A PURPOSE
A dedicated factory floor, with separate areas for raw materials and finished goods. Each has a distinct role in the movement from material to dispatch.
Separate space for materials before they enter production.
The production space supporting moulding and manufacturing operations.
A separate area for finished products ahead of supply.
Dedicated production and separate storage areas. Diagram is illustrative, not an architectural floor plan.
TOOLING & CUSTOMISATION
How does the insect approach? Where should the lure sit? How easily can a grower inspect, empty and reset the trap? These questions belong alongside dimensions and mould design.
Bring an existing product, a drawing, a sample or a new idea. We can discuss customisation of geometry, colour, component fit, lure holders, assembly and packaging to suit the application.
Discuss a custom trap ↗ASSEMBLY & PROJECT SCALE
Moulding capacity is only one part of supply. Trap bodies, lids, funnels, hangers and lure holders need to come together as a practical, serviceable product.
Our project-based assembly workforce of 300+ workers supports different assembly requirements. The assembly scope, inspection criteria, packing format and required quantity are agreed for each order.
Assembly staffing scales with each project.
FROM BRIEF TO SUPPLY
From drawings and samples to tooling, assembly, inspection and dispatch.
Define the species, attraction cue, crop and trapping objective. Monitoring, mass trapping and research sampling call for different design decisions.
Agree entry geometry, lure placement, capture method, material, colour, service access and replaceable parts. A useful trap must work for the person servicing it, too.
Translate the brief into drawings and samples. Agree the handling, fit, weather-exposure and biological evaluation needed for the application.
Review mould design, cavities, material and component fit with experienced tooling professionals. Agree tooling ownership and approve samples before a production commitment.
Schedule moulding and project-specific assembly against the approved product. Define inspection points, packing and the quantity of complete traps required.
Confirm the dispatch plan, spare parts, labelling and destination requirements. Separate the production schedule from freight and delivery time.
QUALITY & PRODUCT RESPONSIBILITY
CropG1 follows industry manufacturing practices. For each project, we agree the relevant requirements, inspection criteria and documentation before confirming supply.
Specific certifications and test results are stated only where applicable documentation is available. Hardware manufacture alone does not establish field efficacy.
INSIDE MANUFACTURING
Factory photographs and process films will be added here. Until then, the image above is an illustration—not a photograph of our premises.
Yes, we welcome custom development enquiries. Share the insect, trapping purpose, design or sample, expected volume and operating conditions. Feasibility, tooling and the development schedule are confirmed for the specific project.
No. This capability applies to most routine trap products, subject to the agreed product and production schedule. New moulds, custom designs, specialised materials and additional testing need separate lead times. Shipping time is additional.
Include hardware only, a compatible lure, or a complete system in your enquiry. We will confirm the exact scope. Trap manufacture and semiochemical formulation are distinct requirements.
Specify the trap or insect, order quantity, annual requirement, destination and required date. Add dimensions, drawings or sample details if available, together with material, colour, branding and packaging preferences.
YOUR NEXT PRODUCTION PROJECT
Routine supply. Custom tooling. Project-scale assembly.