- Catalogue reference
- TS-003 · design and enquiry reference
- Intended application
- Moth monitoring
- Portfolio role
- Semiochemical trapping and monitoring
- Attraction / sampling cue
- Species-specific lure
- Capture / observation
- Replaceable adhesive bottom
- Proposed construction
- Weather-sheltered housing with a replaceable adhesive floor and a separate lure position.
- Collection specification
- Removable liner for inspection, counting and replacement; agree the usable adhesive area and grid before manufacture.
- Dimensions & capacity
- Agreed in the product drawing and quotation; no released dimensions or capacity are claimed for this design brief.
- Materials & finish
- Grade, colour, UV/weather resistance and chemical compatibility to be specified for the installation.
- Supply & lead time
- Custom development enquiry. Feasibility, samples, tooling, quantity, price and lead time confirmed in writing.
- Lure, bait & consumables
- Quoted separately unless expressly included. Species, dispenser, collection medium and replacement schedule must be agreed.